November 23, 2003: Rear spar preassembled.  All looks good so far.
November 23, 2003: Rear spar preassembled. All looks good so far.
Viewed: 37 times.

November 23, 2003: I trimmed the notches out of these ribs so that the reinforcement spar can slip under them.
November 23, 2003: I trimmed the notches out of these ribs so that the reinforcement spar can slip under them.
Viewed: 38 times.

November 24, 2003: Ok, I goofed again...seeesh! Apparently and I can't determine the proper diameter of the ends of the reinforcment spars and I violated the enge distance rules.  I also made sure to properly label the bad parts.  While wainting for the replacements, I was still able to use them to continue building.
November 24, 2003: Ok, I goofed again...seeesh! Apparently and I can't determine the proper diameter of the ends of the reinforcment spars and I violated the enge distance rules. I also made sure to properly label the bad parts. While wainting for the replacements, I was still able to use them to continue building.
Viewed: 46 times.

November 24, 2003: A look into the setup.  The kerosene heater works great!  I work very comfortably when it's freezing out side (40's)!
November 24, 2003: A look into the setup. The kerosene heater works great! I work very comfortably when it's freezing out side (40's)!
Viewed: 42 times.

November 26, 2003: New spars with the proper diameter ends.  Measured three times to make sure!
November 26, 2003: New spars with the proper diameter ends. Measured three times to make sure!
Viewed: 42 times.

November 26, 2003: A lot of work goes into filing down the spars.  I used a vixen file.  A band saw would have been nice for the rought cut followed by the vixen file.
November 26, 2003: A lot of work goes into filing down the spars. I used a vixen file. A band saw would have been nice for the rought cut followed by the vixen file.
Viewed: 40 times.

November 26, 2003: You need to bend the spars up 6 deg.  I made sure to use a piece of plate steel with a radiused edge while held in place with the C-clamp.
November 26, 2003: You need to bend the spars up 6 deg. I made sure to use a piece of plate steel with a radiused edge while held in place with the C-clamp.
Viewed: 42 times.

November 26, 2003: Starting work on the VS.
November 26, 2003: Starting work on the VS.
Viewed: 40 times.

November 26, 2003: First exersize in fluting - this straightens out the ribs since they bow during manufacturing.  I had to premark the rivet holes so that I'd know where to put the flutes.
November 26, 2003: First exersize in fluting - this straightens out the ribs since they bow during manufacturing. I had to premark the rivet holes so that I'd know where to put the flutes.
Viewed: 44 times.

November 26, 2003: Now that the rib has been flattened out, I marked the center of the rib.  The line will appear in the rivet holes and will ensure proper fit with the skins.
November 26, 2003: Now that the rib has been flattened out, I marked the center of the rib. The line will appear in the rivet holes and will ensure proper fit with the skins.