Empenage Kit 
November 27, 2003: Cleco city!  So far everything is aligning very well.  This pre-punched stuff really rocks!
November 27, 2003: Cleco city! So far everything is aligning very well. This pre-punched stuff really rocks!
Viewed: 39 times.

December 5, 2003: Edge finishing, deburring, and dimpling the spars and ribs for the HS.
December 5, 2003: Edge finishing, deburring, and dimpling the spars and ribs for the HS.
Viewed: 39 times.

December 6, 2003: Label, mark, label, and mark more!
December 6, 2003: Label, mark, label, and mark more!
Viewed: 43 times.

December 8, 2003: The results of edge finishing and polishing.
December 8, 2003: The results of edge finishing and polishing.
Viewed: 37 times.

December 13, 2003: Dimpling of the HS skins.
December 13, 2003: Dimpling of the HS skins.
Viewed: 38 times.

December 15, 2003: The VS clecoed together.
December 15, 2003: The VS clecoed together.
Viewed: 37 times.

December 16, 2003: Edge finishing, deburring, and dimpling of the VS internals.
December 16, 2003: Edge finishing, deburring, and dimpling of the VS internals.
Viewed: 39 times.

January 6, 2003: The HS internals all primed and riveted together.  My research lead to a product by Deft.  A water reducible epoxy primer.  Some of the other products actualy attract water. READ THOSE SPEC SHEETS AND CALL THE MANUFACTURER!!
January 6, 2003: The HS internals all primed and riveted together. My research lead to a product by Deft. A water reducible epoxy primer. Some of the other products actualy attract water. READ THOSE SPEC SHEETS AND CALL THE MANUFACTURER!!
Viewed: 39 times.

January 29, 2004: Riveting the skings of the HS.  Ahh, duct tape - a handy third hand!
January 29, 2004: Riveting the skings of the HS. Ahh, duct tape - a handy third hand!
Viewed: 41 times.

January 29, 2004: Inside the HS - every rivet was checked for proper driving.
January 29, 2004: Inside the HS - every rivet was checked for proper driving.
Viewed: 35 times.

Powered by Gallery v1